THE KANZ HOMEOWNER TOOLKIT

A better brief.
A more confident build.

Explore a budget, ask better questions and see what a useful quality record looks like. No signup needed.

01

MAKE THE NUMBERS UNDERSTANDABLE

What could your build cost?

Use the covered built-up area from your drawings, or add the known area of each floor. Plot size alone cannot determine the construction budget.

02

BEFORE YOU SIGN

Does your quotation answer these?

Tick a topic only when it is clearly covered in writing. This helps you prepare questions for any builder; it is not a quality rating or approval of a contract.

The building & its scope
The money & your choices
The build & handover
03

QUALITY YOU CAN ASK TO SEE

Behind the finish, there should be a record.

Explore the information a useful site record should contain. These are illustrative formats, not completed inspections or project evidence.

01 / STRUCTUREBefore a concrete pour
Identify
Pour location, element, date and approved drawing revision.
Check
Reinforcement, cover, formwork, dimensions and embedded services against the approved design.
Record
Inspector, photos, observations, unresolved items and release decision.
Proceed when
The responsible engineer has cleared the required hold point.

Illustrative fields only. Acceptance criteria come from the approved design and inspection plan.

02 / WATERPROOFINGBefore the finish goes on
Identify
Area, approved system, product batch and application stage.
Check
Surface readiness, junctions, application and the specified test.
Record
Test method, duration and result, photographs, defects and reviewer.
Proceed when
Required tests pass and the affected area is released before covering.

Test requirements depend on the approved system and project specification.

03 / SERVICESBefore pipes & wiring are hidden
Identify
Room, line or circuit, service route and current drawing.
Check
The specified plumbing or electrical installation and tests.
Record
Measured results, equipment identification, route photos and corrective work.
Proceed when
The competent reviewer clears concealed work under the project plan.

Safety tests are carried out by qualified personnel using the approved procedures.

04 / HANDOVERBefore you take the keys
Identify
Room-by-room inspection, asset and document register.
Check
Commissioning, agreed snags and the completeness of the handover set.
Record
Snag owner and closure evidence, as-built records, care guides and warranties supplied.
Follow through
Use the written defect-reporting route and applicable contract terms.

The signed scope defines the documents and aftercare obligations for your project.