KANZ CONSTRUCTIONS BEFORE YOU SIGN — HOMEOWNER CHECKLIST 11 September 2026 [ ] 1. Use the same drawings and floor-by-floor area schedule for every bidder. [ ] 2. List units, kitchens, bathrooms, doors, windows and electrical points. [ ] 3. Record exact material models and what each supply allowance buys. [ ] 4. Separate complete installation from equipment or provision-only work. [ ] 5. Identify taxes, authority charges, abnormal site work and exclusions. [ ] 6. Agree selection credits and approve changes with cost and time effects. [ ] 7. Identify the engineer, inspection holds and evidence for payment claims. [ ] 8. Review the programme, handover records and written defect responsibilities. This is a discussion checklist, not a contract, technical approval or legal advice. Project-specific professional review and written schedules govern. Built with clarity. Delivered with discipline. +91 90196 97170 kanzbuilds@gmail.com https://kanzconstructions.com/